Wastewater Treatment Plant Expansion


Introduction:

The Municipality has identified capacity issues at the existing Wastewater Treatment Plant. The Class Environmental Assessment (EA) is now final. The Municipality is proceeding with the design of the Wastewater Treatment Plant expansion. The design will also include equipment to assist with the significant peak flows experienced at the Wastewater Treatment Plant caused by the significant rainwater and groundwater entering the collection system.

Project Description:

The Meaford Wastewater Treatment Plant (WWTP) was originally constructed in 1969 and has since undergone a number of upgrades and modifications, with the most recent work being completed to retrofit the clarifier (used to remove solid particulates or suspended solids from liquid) in 2020.

A Class Environmental Assessment (EA) was completed in 2007 to address the long-term wastewater treatment requirements based on planned future growth. The EA recommended expansion of the existing WWTP, optimizing the existing processes, reducing inflow and infiltration, and improving water conservation.

The 2007 Class EA has since expired and the Municipality of Meaford determined the need to prepare a Class EA Addendum in 2021. The intent of the Addendum was to confirm or amend the preferred solution(s) identified in the original EA by addressing advances in technology, adjustments to phasing due to new population/flow projections, and to share this information with a list of stakeholders and interested parties that has expanded since 2007.

The Municipality of Meaford retained Ainley Group to complete and document the Class EA Addendum in accordance with the Municipal Class Environmental Assessment Document. The Meaford WWTP is located on a 3.9 Hectare parcel of land at 35 Grant Avenue, Meaford.

Contact:

Phases:

December 31, 2028

Anticipated Construction Completion: 2028

December 31, 2026

Anticipated Construction Start: 2026

June 1, 2025

Design Phase: 2024 – 2025

May 1, 2024

Class Environmental Assessment Addendum: 2021 – early 2024

October 12, 2023

Public Information Centre: Thursday, October 12, 2023 from 4:00 p.m. to 6:00 p.m. (Terrace Room, Meaford Hall)

May 1, 2007

Class Environmental Assessment: 2007

Budget:

The project budget for the Class EA Study is $212,662.
The remaining project budget for design and construction will be determined based on the preferred solution from the Class EA.