8 Sideroad Bridge Replacement


Introduction:

The Municipality of Meaford is replacing the bridge on 8 Sideroad (BR-133) to ensure our roads stay safe and reliable. We’re removing the old concrete structure and installing a new prefabricated bridge to maintain service now and in the future.

Project Description:

This project includes: 

  • Full removal of the current concrete bridge 
  • Installation of a new prefabricated superstructure 
  • All work completed by Cox Construction Limited 

Additional Information:

Impact on Residents 

  • Traffic Disruptions: 
    • 8 Sideroad is closed at the bridge throughout construction. 
    • Please use alternate routes for through traffic. 
    • Residents can still access their properties, but do not park on the roadway. 
  • Noise and Dust:  
    • Expect some noise and dust during construction. 
    • The contractor is working to minimize both wherever possible. 

Status: Complete

Contact:

Phases:

October 31, 2025

Ongoing end

September 2, 2025

Anticipated project start

Budget:

Total Budgeted: $820,087

Additional Resources: